Installation Guide
All categories

Installation guide

Installation Standard

①Press Fitting ②Bulge ③Groove ④Weld

B Installation Method

①Press Fitting(Stainless steel pipeline,Carbon steel pipeline) 

Groove—Electric
00:03:08
Bulge—Electric
00:02:39
Press
00:02:34
Press
00:03:05
Press
00:02:48
Bulge—Manual
00:01:53

Installation Standard

Bulge:

10S407-2<Installation of Metal Pipes for Building Water Supply>

CECS153-2003<Technical Specification of Construction Water Supply Stainless Steel Pipeline>

Press Fitting:

GB/T29038-2012<Technical Specification of Thin Wall Stainless Steel Pipes>

CECS153-2003<Technical Specification of Construction Water Supply Stainless Steel Pipeline>

10S407-2<Installation of Thin Wall Stainless Steel Water Supply Pipeline>
Groove:

CECS151:2003<Technical Specification of Grooved Connection Pipeline>

 

Weld:

GB/T29038-2012<Technical Specification of Thin Wall Stainless Steel Pipes>

CECS277:2010<Technical Specification of Construction Water Supply and Drainage with Stainless Steel Pipeline>

CECS153-2003<Technical Specification of Construction Water Supply Stainless Steel Pipeline>

10S407-2<Installation of Thin Wall Stainless Steel Water Supply Pipeline>

JB/T9185-1999<The Technique of protecting Tungsten and other Inert Gases>

GB50236-2011<Construction Specification of Field device 、Industrial Pipeline Weld Engineer>

Add:678 Dingxiang Road, Binhai Industrial Park
Wenzhou, Zhejiang Province People's Republic of China 
Tel:
0577-85800 999
Fax: 0577-8685 8288
Web:http://www.chncon.com/
Service Hotline:
Engineering 400-990-5585   
Home decoration
400-808-7577

       

Follow CHNCON

CHNCON

Mobile terminal

CHNCON

WeChat official account

OPYRIGHT © 2020 ZHENGKANG ALL RIGHTS RESERVED., 浙ICP备11018507号-2